FLL Taxiway C

Airports

FLL Taxiway C

Client:

Broward County Aviation Department

SCOPE

Demolition, FAA-spec asphalt paving, underground utilities, storm drainage, airfield duct banks

CATEGORY

Airports

CONTRACT VALUE

$20.7M

PROJECT SIZE

Taxiway C East End

project role

Subcontractor

Project Overview

TAXIWAY C RECONSTRUCTION AT FLL

Central Civil performed demolition and underground utility construction for the Taxiway C East End and High-Speed Taxiways project at Fort Lauderdale-Hollywood International Airport under a $20.7 million contract with Reynolds, Smith and Hills. New asphalt runway and taxiway paving was constructed to FAA specifications with continuous maintenance of airside traffic operations.

The scope included utility construction in contaminated conditions with full removal and replacement of storm systems and underground duct banks for power, communications, and airfield lighting. Major piping installations included 36- to 48-inch RCP along with associated concrete structures.

All earthwork and disposal of spoils from pavement excavation and underground demolition was self-performed, maintaining strict stormwater pollution prevention and temporary pavement marking protocols throughout the active airfield environment.

Key Highlights

$20.7M taxiway reconstruction and new high-speed taxiway construction

FAA-specification asphalt runway and taxiway paving

36- to 48-inch RCP storm drainage system installed

Underground duct banks for power, communications, and airfield lighting

Full airside traffic and operations maintained throughout construction

Project Photography

Photo Gallery

MORE AIRPORT WORK

Related Projects

MIA Central Base Apron and Utilities

Miami-Dade Aviation Department

FLL Expansion of Runway 9R-27L

Broward County Aviation Department

FLL Terminal 1 Utilities

Broward County Aviation Department

Have a Similar Project?

Tell us about your scope and our team will be in touch within two business days.

bottom of page