Port of Miami Tunnel

Utility Infrastructure

Port of Miami Tunnel

Client:

Florida Department of Transportation

SCOPE

Mass excavation, CSM wall installation, tunnel bore machine support, geotechnical coordination

CATEGORY

Utility Infrastructure

CONTRACT VALUE

Available Upon Request

PROJECT SIZE

42.5 FT Deep

project role

Subcontractor

Project Overview

ONE OF SOUTH FLORIDA'S DEEPEST EXCAVATIONS

Central Civil performed mass excavation to 42.5 feet below grade in support of the Port of Miami Tunnel bore machine operations — one of the deepest excavations in South Florida's construction history. The scope included installation of CSM (Cutter Soil Mixing) walls to support the excavation and preparation of the launch pit for the tunnel boring machine.

The depth and complexity of the excavation required precise geotechnical engineering coordination and strict monitoring of adjacent structures and utilities throughout the operation. CSM wall construction provided the structural retention system enabling safe excavation at unprecedented depth for a South Florida civil project.

The Port of Miami Tunnel project is a landmark infrastructure achievement for the region, and Central Civil's excavation and ground support work was foundational to the tunnel's successful delivery.

Key Highlights

42.5-foot deep excavation — one of the deepest in South Florida history

CSM (Cutter Soil Mixing) wall installation for structural retention

Tunnel bore machine launch pit preparation and support

Continuous monitoring of adjacent structures and utilities

Foundational civil work for the Port of Miami Tunnel — a regional landmark

Project Photography

Photo Gallery

MORE UTILITY INFRASTRUCTURE WORK

Related Projects

EAA A-1 Flow Equalization

South Florida Water Management District

Southwest Well Fields

Miami-Dade County Water and Sewer Department

MIC GMP 6-C

Florida Department of Transportation

Have a Similar Project?

Tell us about your scope and our team will be in touch within two business days.

bottom of page