Airports

/

MIA Tract 1 Utilities and Apron

Airports

MIA Tract 1 Utilities and Apron

Client:

Miami-Dade Aviation Department

SCOPE

Portland cement concrete apron, utility systems replacement, jet fuel system, underground duct banks

CATEGORY

Airports

CONTRACT VALUE

$17.5M

PROJECT SIZE

MIA Tract 1 Apron

project role

Subcontractor

Project Overview

APRON AND UTILITY RECONSTRUCTION AT MIA TRACT 1

Central Civil executed demolition and complete underground utility reconstruction for the Tract 1 Utilities and Apron project at Miami International Airport under a $17.5 million contract managed by BND Engineers. New Portland cement concrete paving was constructed in excess of 14 inches thick, with asphalt aprons installed to FAA specifications throughout the project area.

The utility replacement scope included full removal and installation of water, fire, sewer, storm, jet fuel, and power and communications duct bank systems — all performed in contaminated conditions. Major piping installations ranged from 24- to 60-inch RCP and included 12-inch DIP mains with associated concrete structures.

Airside traffic and operations were maintained throughout with continuous stormwater pollution prevention and temporary pavement marking programs.

Key Highlights

$17.5M apron and utility reconstruction at MIA Tract 1

Portland cement concrete paving over 14 inches thick to FAA specification

Full replacement of water, fire, sewer, storm, and jet fuel systems

Piping from 24- to 60-inch RCP installed in contaminated conditions

Underground duct banks for power and communications throughout

Project Photography

Photo Gallery

MORE AIRPORT WORK

Related Projects

MIA Central Base Apron and Utilities

Miami-Dade Aviation Department

FLL Expansion of Runway 9R-27L

Broward County Aviation Department

FLL Terminal 1 Utilities

Broward County Aviation Department