FLL High-Speed Taxiways

Airports

FLL High-Speed Taxiways

Client:

Broward County Aviation Department

SCOPE

Demolition, asphalt taxiway and runway paving, underground utilities, storm drainage, airfield lighting duct banks

CATEGORY

Airports

CONTRACT VALUE

$25.4M

PROJECT SIZE

FLL Taxiway System

project role

Subcontractor

Project Overview

HIGH-SPEED TAXIWAY CONSTRUCTION AT FLL

Central Civil performed demolition, underground utility work, and full-depth asphalt runway and taxiway construction for the High-Speed Taxiways and Taxiway Rehabilitation project at FLL under a $25.4 million contract managed by TYLin International. All new paving was constructed to FAA specifications with complete maintenance of airside traffic and stormwater pollution prevention throughout.

Utility work was executed in contaminated conditions, including removal and replacement of storm systems and underground duct banks for power, communications, and airfield lighting. Large-diameter piping installations included 36- to 48-inch RCP mains with associated concrete structures.

All earthwork and disposal of soil and spoils from demolition — including pavement excavation for all underground work — was self-performed, reflecting Central Civil's integrated approach to complex airfield civil construction.

Key Highlights

$25.4M high-speed taxiway and rehabilitation project at FLL

FAA-specification asphalt runway and taxiway paving throughout

36- to 48-inch RCP storm drainage installed in contaminated conditions

Underground duct banks for power, communications, and airfield lighting

Full airside traffic maintenance maintained for duration of construction

Project Photography

Photo Gallery

MORE AIRPORT WORK

Related Projects

MIA Central Base Apron and Utilities

Miami-Dade Aviation Department

FLL Expansion of Runway 9R-27L

Broward County Aviation Department

FLL Terminal 1 Utilities

Broward County Aviation Department

Have a Similar Project?

Tell us about your scope and our team will be in touch within two business days.

bottom of page